LW 7015 V2 - 8 pcs.
Installed in 2018.
The project is carried out together with TEHAIX Łukasz Stępniak.
Number of screens: | 1 |
City: | Pyzdry |
Country: | Poland |
LW 7015 V2 - 8 pcs.
Installed in 2018.
The project is carried out together with TEHAIX Łukasz Stępniak.